It has found reasonable ways brought roadbed to resultant stabilization owning to synthesize many factors such as earthiness,hydroclimate,wheather etc to find self weight and external load of roadbed.
本文结公路施工实例,论述了理的通车碾压工后沉降期及相应制约因素,综了土质水文、候天等制约因素,寻找路基自重外荷载作用,使路基达到最终稳定的理途径。