In June1957, forging and coldworking workshops equipped with metal processing capability were established, and the plant began to repair and build barge, repair steamer steering gear and windlass.
1957年6月,建立锻造和冷作车间,具备了一定的金属加工能力,开始造、理蒸汽舵、锚。
In June1957, forging and coldworking workshops equipped with metal processing capability were established, and the plant began to repair and build barge, repair steamer steering gear and windlass.
1957年6月,建立锻造和冷作车间,具备了一定的金属加工能力,开始造、理蒸汽舵、锚。
声明:以、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。