3.The design of the breakwater was based on the recommendations of an engineering study.
这道防浪堤的设计是建立在程学研究建议的基础上的。
4.The whole process of breakwater riprapping construction was monitored by the prototype monitoring device buried in the sand soft nappe.
摘要通过埋设在砂肋软体排上的原形观测仪器,对防浪围堤抛过程进行了全程监测。
5.The project department monitors and controls the whole process of breakwater enrockment costruction by field observing instruments buried in sand soft nappe.