The architectural proposal will consist of an offshore cultivation farm, farmers’ bothy, floating restaurant and new pier seaweed baths and drying tower.
For lack of the theoretical calculation method at present,the skew bridge backwater is simulated in adopting circle pier and embank uncompressing river through hydraulic models.
Construction of a new pier after removal of the existing pier including dredging, provision of handrails, a navigation light, bollards and fendering systems together with transplantation of coral.
The technique of pier integral precasting at the sea was researched and applied in the innavigable section construction of Donghai Bridge(the first bridge at the sea in China).
With descending of the main pier s foundation slab and integral moving of pier,not only the navigable dimensions meet the demand,but also the influence on upbound ships is very li.