有奖纠错
| 划词

A new multiqueue method with variable priority is presented to solve the real time dynamic scheduling problem of automatic transportation system in flexible electrophoresis production line.

提出可级的多重任务队列方法,解决电柔性生产线自输送系统的实调度问题。

评价该例句:好评差评指正

用户正在搜索


as much, as much as possible, as opposed to, as planned, as regards, as required, as soon as, as soon as possible, as such, as the case might be,

相似单词


3G, 401(K), a,

声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。

  • 微信二维码

    关注我们的微信

  • 手机客户端二维码

    下载手机客户端

赞助商链接