It is found that the rational located destressing boreholes can induce structural failure of the surrounding rock-mass,consequently the high stress move deeply in the rock-mass,and the stres...
在孔和锚网联合支护后改善了围附近的应环境,改了围破坏的时空次序,对控制围和破坏具有突出的优越性.
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
关注我们的微信
下载手机客户端
划词翻译
详细解释